What is the procedure from Start to Finish? And how long does it take?

At Design Excellence, once the drawings are signed and the order is placed, it takes between 4 to 6 weeks for the cabinets to arrive. During this time the contracting work such as, electrical, plumbing, flooring, drywall etc. is done, and the kitchen is prepped and ready for the cabinets to be installed.

Installation can take anyway from a day to a week or more, depending on the size of your kitchen. During the installation and after the base cabinets are installed, the templating for the counter top is done. From templating to installation the counter top could take anyway from 1 to 3 weeks. Add another week for the backsplash, painting, final touch ups etc. and your kitchen should be completed within 9 to 10 weeks